Welcome!
In case of any abnormal condition, the power supply shall be cut off immediately, and it can be reused after being eliminated. For winter production, when the temperature is below 0 ℃, hot water must be used to melt the ice in the quantitative pump and pipeline, otherwise the connecting rod will be broken or the machine will not start.
Regularly check each shift to remove the foreign matters on the end face of the transverse heat seal copper block, and no scaling is allowed, otherwise, the heat conductivity will not drop, the temperature of the copper block will increase, and the transverse heat seal heat sealing and cutting bag will be abnormal.
Contact Us
Shanghai Jimei Food Machinery Co., Ltd.