Welcome!
During the filling process of EPS embankment, attention must be paid to the connection between EPS and general filling sections. A transition section shall be set at the longitudinal connection section of EPS and soil embankment, that is, the EPS block shall be connected with the soil embankment in the form of steps, and the same is true in the transverse direction. At the same time, the EPS block shall be paved in a crisscross manner in the longitudinal and transverse directions, so as to facilitate the continuous stress and deformation of the EPS block.
EPS, as an ultra light subgrade filler, is widely used abroad. The practice has proved that EPS has good thermal insulation, light self weight, strong self-supporting and other excellent properties, and has good treatment effect on solving problems such as subgrade frost damage, bridge head bump, subgrade instability, new and old subgrade splicing, etc.
Contact Us
Yantai Jedha Industrial and Trading Co., Ltd.