Welcome!
During the filling process of EPS embankment, attention must be paid to the connection between EPS and general filling sections. A transition section shall be set at the longitudinal connection section of EPS and soil embankment, that is, the EPS block shall be connected with the soil embankment in the form of steps, and the same is true in the transverse direction. At the same time, the EPS block shall be paved in a crisscross manner in the longitudinal and transverse directions, so as to facilitate the continuous stress and deformation of the EPS block.
EPS construction does not require special machinery, but can be carried out manually. It is fast and suitable for emergency rescue and disaster relief. It is more suitable for places where large machinery is difficult to use. It can be processed and cut on site to meet the requirements of the site terrain.
Contact Us
Yantai Jedha Industrial and Trading Co., Ltd.