Welcome!
The water pipe shall be firmly bound with the reinforcement framework or erected reinforcement to prevent water blockage or leakage due to deformation or joint detachment of the water pipe during concrete pouring. After the installation of the water pipe network, connect the inlet and outlet pipe orifices with the inlet and outlet main pipes and water pumps for a water connection test. The water pipes are required to be smooth and free of water leakage.
Contact Us
Foshan Xinliang Baodi Hardware Co., Ltd.